Queen of Apostles

Queen of Apostles Early Learning Centre

Location

Riverton, WA

Client

Catholic Education of WA

Superintendent

EIW Architects

Architect

EIW Architects

Contract Type

Construct Only

$2.9m

Project value

8

Months to build

2017

Completed

PROJECT HIGHLIGHTS

  • Restrictive Site Access
  • Live Operating Environment
  • Staged Project Delivery

The contract scope included the construction of a new Early Learning Building and associated playscapes, an elevated veranda extension to an adjoining building and a new asphalt carpark.

The building structure was comprised of a structural steel portal frame, brick and metal stud veneer walls and internal stud partition walls.  The internal finishes were typical of commercial building with vinyl floor finishes, tiled wet areas, and sealed concrete store rooms.

The project location contributed to a number of buildability challenges. This was due to the site being next door to a group of residential premises as well as the operating school building. The works required the replacement of adjoining fences and traversing through the school grounds to access parts of the site for the works.

Whilst performing the earthworks for the carpark construction, a live asbestos water main was uncovered. The shutdown, removal and replacement works were planned and integrated into the Construction programme immediately to mitigate delays. Despite this the project team still delivered the project on programme through segmenting the works to enable concurrent trade works.